Inicio/Licitaciones Públicas/Servicios Comerciales, de Gestión, Asesoría, Marketing y Seguridad/Integration of the membrane distillation modules ordered to RN Solutions into the skid provided by Telwesa. Hydraulic connection of the two skids supplied by Telwesa (membrane distillation skid and gas boiler skid). Electric connection of both skids to the main grid. All of these are to be done in situ.
CAT
Fundació Institut Català de Recerca de l'Aigua (ICRA)
Catalunya|Cataluña
Integration of the membrane distillation modules ordered to RN Solutions into the skid provided by Telwesa. Hydraulic connection of the two skids supplied by Telwesa (membrane distillation skid and gas boiler skid). Electric connection of both skids to the main grid. All of these are to be done in situ.
Resumen del contrato
Integration of the membrane distillation modules ordered to RN Solutions into the skid provided by Telwesa. Hydraulic connection of the two skids supplied by Telwesa (membrane distillation skid and gas boiler skid). Electric connection of both skids to the main grid. All of these are to be done in situ.
✨
Descubre si esta licitación encaja contigo
Documentación oficial adjunta (0)
No hay documentos adjuntos disponibles para esta licitación pública.
Presupuesto Base (Sin IVA)
8801 €
Plazo de presentación
Sin especificar
- EstadoAbierta
- ProcedimientoAbierto simplificado
- TipoObras
- CategoríaCPV 79200000
- Expediente2025/2/819
- Publicado03 mar 2026

